Shibby's Construction Parts
by SillyShibby
2 years ago
196
- Construction Parts production line from 1 to 4
- Balancers inside set to priority from dumping boxes on the right (from deconstruction or main ship storage)
- 50/50 to big box storage and production of next tier parts. (can be set as needed)
- Input boxes for raw materials are all on the left, input of finished parts left lying around from the right
- production chain is expandable, 2 tiles apart for easier identification of copying area
| Version | Released | Downloads | Copy |
|---|---|---|---|
| 1 Current | 2 years ago | 196 |
No comments yet.
Link copied to clipboard
Paste it into the game: Blueprints → Import from string. The game fetches the blueprint itself, so the link is all you need.
On an older game build that doesn't take links? Copy the blueprint string instead: